Halls 2 and 3a

Hall 2

The new Hall 2 is an energy-saving construction. Together with Hall 3 and Hall 1 (Schwabenhalle), it will represent the perfect hall-combination and complete the site-tour. The grand opening took place in October 2019.

Hall 3a - Can be combined with the outdoor fairgrounds

Separate entrance from the fairgrounds. In addition, the hall can be combined with the neighboring outdoor fairgrounds.